Home / Manufacturing
MANUFACTURING
Explore the production units, machinery and product-dependent capacities behind Concord’s apparel manufacturing.
CRWL · MAIN FACTORY
40,000
sq. ft. working area
8
sewing lines
770
team members
Sharifpur, National University, Gazipur.
Woven bottoms, cargo pants and jackets.
CCL · SISTER CONCERN
35,000
sq. ft. working area
6
sewing lines
575
team members
299, Degerchala Road, Gazipur.
A dedicated woven garment manufacturing unit.
Factory figures are from the Company Profile 2025. Product-dependent capacities are alternatives, not additive.
CONCORD RAIMENT WEAR LTD.
Woven basic bottoms220,000
Cargo pants140,000
Jackets120,000
Pieces per month. These are alternative product scenarios; do not add them together. Actual output depends on style and order requirements.
INFRASTRUCTURE & EQUIPMENT
A four-storey building with a fire extinguishing system is listed in the profile.
Juki, Brother and Jack sewing equipment
HASIMA fusing & needle detection equipment
JDP fabric inspection machine
Juki automatic pocket welt machine
Generator & boiler infrastructure
Sharifpur, National University,
Gazipur, Bangladesh.
40,000
sq. ft. working area
8
Sewing lines
770
Team members
435
Automatic sewing machines*
PRODUCTION WORKFLOW
The profile describes development, sampling, production, quality control and shipment as connected parts of Concord’s operations.
01
Translate your specifications into patterns, fit samples and approved pre-production samples.
02
Fabric inspection, CAD-assisted pattern work and coordinated sewing across our production lines.
03
Quality control through production, with finishing checks and needle detection equipment listed for both units.
04
Order coordination and shipment through Chattogram seaport or Dhaka airport, as agreed with the buyer.
COMMON BUYER QUESTIONS
General MOQ of 2,000 pieces per colour, with some orders as low as 500 pieces. Fabric, garment style and delivery schedule determine feasibility. Please discuss your project with our team.
Proto/fit samples at 4–8 working days, pre-production samples at 5–10 working days and size sets at 5–7 working days. Salesman samples are listed at 4–6 weeks. Timelines depend on the brief and material availability.
Lead times depend on style, quantity and sourcing. It may take 60–90 days for local fabrics and trims and around 120 days for imported materials. Confirm the schedule for each order before committing.
Sea shipments are routed through Chattogram, and air shipments through Dhaka airport (DAC)
Select Concord Creations Ltd. in the enquiry form, or contact concordcreationsltd@gmail.com. Our team can discuss the unit’s woven manufacturing capabilities and availability.
Tell us what you’re making. Let’s explore how Concord can help.